Mick helped drywall the items in the attic that needed spray foam insulation. John from A&J Windows installed the back sliding door which looks awesome! George finished and had the insulation inspected by the end of the week.
We had a bunch of trim samples in the house this week, and Jess and Sharon selected a pretty clean, basic option that will work well with their decor. The drywall was delivered throughout the house, so we are raring to go!
The windows were installed (luckily I transferred some math skills to the stucco installed and everything worked out (we usually do stucco AFTER windows!)) and Thom made great progress on the stone in the front.