Week 16: Tile Installation

Fred ("you pick 'em, I stick 'em") was in all week doing the tile work.  In the shower below the designer was going for more of a wood look on the back wall to match the hardwood floors.... 

Week 15: Tile Prep

Freddy was in, prepping the floors for tile and working with Kevin to coordinate the floor warming for the master ensuite.  Tile should be done and floors started next week!

Week 14: Taping Done!

Despite a lot of humidity, the drywall tapers managed to finish this week.  The house looks great!  

Week 13: The Thinker

Drywall installation was completed this week.  Careful contemplation always makes for a faster, neater job!