The HVAC and plumbing rough-ins started last week. For HVAC, we're reconnecting/moving all of the existing systems to work with the current wide open plan. We'll have to get creative with the duct work and plumbing that has to run under the steel beams now - always an issue with open-concept living.
Lorin, the front landscape contractor, was busy this past week getting all of the elements measured and laid out. By the end of the week, the front steps were in, as was the grass! Inside, Fred, the installer from Marcon Kitchens came in exactly on schedule and started the installation of the kitchen. He works alone, quietly and efficiently and has been doing a great job.