Week 12: Insulation done

Mick helped drywall the items in the attic that needed spray foam insulation.  John from A&J Windows installed the back sliding door which looks awesome!  George finished and had the insulation inspected by the end of the week.

Week 11: Getting ready for drywall (and trim?)

We had a bunch of trim samples in the house this week, and Jess and Sharon selected a pretty clean, basic option that will work well with their decor. The drywall was delivered throughout the house, so we are raring to go!

Week 10: Progress

Stone complete? Check!  Tub installed? Check!  Tech and central vac roughed-in? Check!!!

Week 9: Windows and stone

The windows were installed (luckily I transferred some math skills to the stucco installed and everything worked out (we usually do stucco AFTER windows!)) and Thom made great progress on the stone in the front.